Skip to content

Garpasjær west

Garpeskjær west

 

In the spring of 2023, Havnekraft commissioned a new shore power plant at Garpeskjær west (Haugesund Cruise Terminal).
The facility is designed to be able to provide high-voltage shore power to cruise ships and low-voltage shore power to offshore ships, liners and other vessels.
The plant has a total output of 11.5kW and the possibility of a low-voltage supply of 400/440/690 VAC (50 / 60 Hz), as well as a high-voltage supply of 6.6 kV or 11 kV (50 /60 Hz). The plant is built according to the standard for shore power (IEC 80005).

Order shore power













    Power supplied by HavneKraft

    953 MWh
    953 MWh
    252,5 tonn CO<sub>2</sub> saved
    252,5 tonn CO2 saved

    Havnekraft AS is owned 50/50 by Haugaland Kraft and Karmsund Havn, and our strategic goal is to establish, own and operate shore power facilities and green power solutions for the maritime industry.

    Havnekraft AS is owned 50/50 by Haugaland Kraft and Karmsund Havn, and our strategic goal is to establish, own and operate shore power facilities and green power solutions for the maritime industry.

    A company owned by